Capabilities

The gap is usually coordination,
not workmanship.

Anyone can cut a panel. What fails on overseas packages is the translation between a designer's intent and a factory's understanding — and the discipline to stop and check before cutting. That translation is our actual product.

01 · Engineering

Everything begins
with a shop drawing.

Our engineering team works from your architectural set — plans, elevations, sections, finish schedules and door schedules — and turns it into fabrication-level drawings showing core build-up, veneer layon, edge details, hardware positions and site-fixing methods.

Before that, we issue a written review of the drawing package: what is dimensioned, what is not, where two details clash, and what we need to price it properly. You get this before a price, not after.

Typical turnaround: drawing review in 48 hours; full shop drawing set in 5–8 working days.

Shop drawings reviewed on screen with factory engineering team

02 · Manufacturing

Five disciplines,
one coordinated package.

A single workshop cannot do joinery, stainless steel, stone, terrazzo and upholstery well. Rather than pretend otherwise, we coordinate a fixed network of specialist workshops we have worked with for years — and hold the engineering and quality control ourselves.

DISCIPLINE 01

Timber & joinery

Veneer layon, flitch matching, solid timber frames, coffered ceilings and staircases. Humidity-controlled assembly area.

DISCIPLINE 02

Metal

Laser cutting, CNC punching, 5-axis routing, bending and welding in aluminium and stainless. PVD and powder coating lines.

DISCIPLINE 03

Stone

5 mm veneer lamination to honeycomb, book-matched slab selection, edge profiling and dry-lay before crating.

DISCIPLINE 04

Terrazzo & cast

Precast terrazzo panels, cast glass and solid surface — moulds made to your profile, polished to specified sheen.

DISCIPLINE 05

Upholstery

Contract-grade foam and fabric, CAL TB 117 compliant, with frame testing on seating before batch release.

DISCIPLINE 06

Consolidation

All disciplines packed to one load plan, so a hotel package arrives as a calculated number of containers, not an accidental one.

03 · Quality control

Five checkpoints
before anything ships.

Quality control is not an inspection at the end. It is five separate decisions, each of which can stop production:

1. Incoming material. Veneer batch, board grade and coating lot checked against the approved sample.
2. First article. One full unit built and reviewed in detail against the shop drawing.
3. Mock-up approval. Representative bay or tread run photographed or shipped for sign-off.
4. In-process. Dimension and finish checks at agreed intervals during the run.
5. Pre-shipment. Full inspection report with photo set, issued before crating begins.

You receive the report and photographs whether or not you ask for them.

Finished panels on racking in the packing area

04 · Packing & logistics

Where most damage
actually happens.

A flawless panel can arrive ruined. Finishes mark, edges crush and moisture warps — almost always in the last two weeks of a project's life, not the first two.

Our packing standard: ISPM-15 heat-treated crates, foam and corner board on every finished edge, moisture barrier with desiccant, and internal bracing so panels cannot shift. Loading plans are drawn per container, not improvised at the dock.

We ship FOB Shenzhen / Yantian or CIF to your port, and can work with your freight forwarder or nominate one.

Stacked panels with edge protection ready for container loading

05 · Compliance

Reports, not assurances.

StandardScopeRequirementOur position
ASTM E84Surface burning characteristicsClass A, FSI ≤ 25Class A on specified build-ups
TSCA Title VIFormaldehyde, EPA 40 CFR 770≤ 0.05 ppmCompliant composite cores
CARB Phase 2Formaldehyde, California≤ 0.05 ppmCompliant composite cores
EN 13501Reaction to fire, EUB-s1,d0 / A2-s1,d0Available on specified cores
FSCChain of custodyFSC Mix / FSC 100%On request, lead time applies
ISPM-15Wood packagingHeat treatment + markStandard on all crates
CAL TB 117-2013Upholstery flammabilitySmoulder resistantStandard on seating foam
ISO 9001 / 14001 / 45001Management systemsThird-party certifiedCertified since 2013

Test reports are available for download on request, without a sales call. Where a project requires a standard we cannot meet, we will say so before quotation rather than after.

Have a drawing that keeps coming back with problems?

Send it over. A written review costs nothing and often saves a whole revision cycle.

Send your drawings